Skip to main content
Version: OpCon 22.0 (On-Prem)

Tags

The Tags tab in the Job Master editor allows you to define and maintain tags that should be associated with the job. You may want to tag the job as "Critical" or as a part of a program group. An unlimited number of tags can be defined for each job. These tag names will be built into the Daily tables by the Schedule Build process, and the Operations views can be filtered based on these tags.

 

Within the tab, you will be able to: