Obsolete2-Unit 1 Exercise 9
Exercise 9: Workflow Designer
Objective
To use Wokflow Designer in Enterprise Manager to add a job and its dependency to an existing schedule.
Summary
Open Workflow Designer and create a new Job named WINDOWS JOB 5 in MY FIRST SCHEDULE. Give the Job the same details as the existing Jobs within this Schedule. Give the Job a Requires Dependency for WINDOWS JOB 4.
Note
This exercise will be work in Enterprise Manager
Instructions
- Open Enterprise Manager.
- Click on Yes, on the Daily Purge popup window, if it occurs.
In Workflow Designer In Enterprise Manager
- Under the Administration topic, double-click on Workflow Designer.
- From the Select Schedule list on the right, select My First Schedule.
- In the Tools section on the right, select the Add Job tool.
- In the white workspace, click to add a job.
Creating the New Job on the Job Master Screen
- In the Name field, enter Windows Job 5.
- In the Job Type drop-down, select Windows as Job Type.
- In the Primary Machine drop-down list, select the
SMATraining
machine for the Job to run on. - In the User ID drop-down list, select
SMATRAINING\SMAUSER
- In the Command Line field, use CTRL + F to pull up the previous command lines used and select one that looks similar to the following:
"C:\Program Files\OpConxps\MSLSAM\Genericp.exe" -t10 -e0
- Click the Save button in the Job Master toolbar at the top right of the screen.
- Click on Frequency tab.
- Under the Frequency List box, click Add.
- In the Frequency Definition Wizard, select Example-Mon-Sun-O from the drop-down list.
- Click Next and Finish.
- Click on the X to the right of the Job Master tab to close the Job Master screen.
Adding the Dependency in Workflow Designer
- In the Tools section on the right of the Workflow Deisgner screen, click Add Dependency.
- Click on Windows Job 4, which is the object of the dependency.
- Click on Windows Job 5, to create the dependency.
- In the Job Dependency window, validate that Requires is the Dependency Type and that Finished OK is the Option selected.
- Click OK to save the Job dependency.
- Close the Workflow Designer tab.
Note
Notice that the mouse icon keeps the “Add Dependency” pointer. You can click “Select” from the Tools panel or just press the escape key.