Re-Synchronizing Running Jobs
To perform this procedure:
- Double-click on Machines Status under the Operation topic.
- Click on the Table tab or the Map tab.
- (Optional) Right-click on the machine that requires the number of running jobs to be reset.
- Click on Re-Synchronize Running Jobs from the menu. :::