Skip to main content
Version: OpCon 21.0 (On-Prem)

Re-Synchronizing Running Jobs

To perform this procedure:

  1. Double-click on Machines Status under the Operation topic.
  2. Click on the Table tab or the Map tab.
  3. (Optional) Right-click on the machine that requires the number of running jobs to be reset.
  4. Click on Re-Synchronize Running Jobs from the menu. :::