Skip to main content
Version: OpCon 22.0 (On-Prem)

Adding Jobs from Job Master to Daily Schedule

note

Jobs can be added from the Job Master to the Daily Schedules regardless of the daily schedule's status or the Job's build status. For more information, refer to Adding Jobs to Daily Schedules in the Concepts online help.

To perform this procedure:

Double-click on Daily Maintenance under the Operation topic. The Daily Maintenance screen displays.

Click on the Expand Arrowarrow to expand the date for the schedule then click on the Schedule that has the job to be added.

note

If a schedule date is selected, the jobs displayed in the Master frame will be from the Adhoc schedule. If a schedule is selected, the jobs for that schedule will be displayed in the Master frame.

In the Master frame:

Select the Job checkbox(es) that you want to add to the schedule.

note

If the job name is not visible, use the scroll bar to scroll through the list in the Master frame or enter the first few letters/values for the job name in the Type Filter Text box in order to narrow the search.

Click the Add Job button to add the job(s) from the Master to the Daily schedule. The Confirm Add Job To Schedule dialog displays.

In the Build Status frame:

Select the On Hold checkbox if the job is to be added in an On Hold state - or -

Select the Released checkbox if the job is to be added and Released.

In the Frequencies frame:

Select the frequency.

(Optional) Click on the Instance Properties tab and/or click on the Instance Machines tab.

a. Define the job instance properties by entering the name and value for the property in the specified format. b. Click on the drop-down arrow and select a machine or select <None> to build an instance for each machine in the defined Machine Group.

Click the Yes button to confirm the request sent for "job name" or click the Cancel button to cancel the request.

If multiple jobs were selected:

Repeat Steps 4 - 9 to add the additional jobs information.

If you need to add additional property definitions:

Repeat Steps 5 - 9.

Click on the x to the right of the Daily Maintenance tab to close the Daily Maintenance screen.