Viewing Container Jobs' SubSchedules
To view the SubSchedule:
- Double-click on PERT under the Operation topic. The PERT screen displays.
- Click on the schedule that contains the job.
- Right-click on the Container job box.
- Click on Open SubSchedule from the menu.
- Work with the jobs in the subschedule, as needed. :::