Setting Preferences for Workflow Designer and PERT
To set the preferences:
- Launch the Enterprise Manager application.
- Use menu path: EnterpriseManager > Preferences. The Preferences dialog displays.
- Click on the arrow () next to Enterprise Manager in the Preferences tree to expand the drop-down list.
- Click on Workflow Designer/PERT. The Workflow Designer/Pert settings display to the right.
- (Optional) Enter the value that defines the amount of Spacing between nodes (the default is set to 20).
- (Optional) Enter the value that defines the maximum number of Threshold/Resource dependencies to display before automatically turning off the display (the default is set to 300). Set the value to zero (0) to display unlimited dependencies.
- (Optional) Select Top to Bottom or Left to Right from the Default layout drop-down list.
- (Optional) Click on the color button for the dependency type (e.g., Requires, After, Excludes, and Conflict). The Color dialog displays.
- (Optional) Select the color for the dependency type and click OK.
- Select the Show frequency names checkbox to show the frequency names in the job boxes. This option is turned off by default.
- Select the Show Job status description checkbox to show the job status name in the job boxes. This option is turned on by default.
- Select the Analyze circular dependencies checkbox to check for circular dependencies. This option is turned off by default.
- Select the Do not draw PERT on date selection checkbox to avoid drawing the PERT on dates. This option is turned off by default.
- Click Apply to save the changes in this dialog.
- Click OK to save the changes and close the Preferences dialog.