Using Plan Mode

The Plan mode in the Gantt chart can be used to alter the start time of a job or changing the length of time a job takes to run.

To use plan mode:

  1. Double-click on Gantt under the Operation topic. The Gantt screen displays.
  2. Click on the Gantt button on the Gantt toolbar.
  3. (Optional) Use your mouse pointer to hover over the job box until the four directional arrow appears.
  4. Click and drag (using the left mouse button) the job box to the new estimated start time for the job.
  5. (Optional) Use your mouse pointer to hover over the end of the job box until the bi-directional arrow appears.
  6. Hold the left mouse button down and drag the end of the job box to the new estimated job end time. :::