Using Plan Mode

Theme: Configure
Who Is It For? System Administrator, Automation Engineer

What Is It?

The Plan mode in the Gantt chart can be used to alter a job's start time or run duration.

To use plan mode, complete the following steps:

  1. Select on Gantt under the Operation topic. The Gantt screen displays
  2. Select on the Gantt button on the Gantt toolbar
  3. (Optional) Hover over the job box until the four directional arrow appears
  4. Select and drag the job box to the new estimated start time
  5. (Optional) Hover over the end of the job box until the bi-directional arrow appears
  6. Hold the left mouse button and drag the end of the job box to the new estimated end time

Configuration Options

SettingWhat It DoesDefaultNotes

FAQs

Q: What can you do with Plan Mode?

Plan Mode allows you to manage and configure related settings.

Q: Who has access to Plan Mode?

Access to Plan Mode is controlled by the privileges assigned to your OpCon role. Contact your system administrator if you need access.

Glossary

Role: A named security profile in OpCon that groups privileges together. Roles are assigned to user accounts to control which features, schedules, jobs, machines, and administrative functions a user can access.

Privilege: A specific permission granted through an OpCon role that controls access to a feature, function, or object type. Privileges are organized into categories such as Function Privileges, Machine Privileges, Schedule Privileges, and Access Codes.

Job: The fundamental unit of work in OpCon. A job defines what to run, on which machine, when to start, and what conditions must be met. Job results are tracked and can trigger events and notifications.

OpCon: Continuous' workflow automation platform. The OpCon server includes the database, SAM and Supporting Services (SAM-SS), and graphical user interfaces. agents installed on target platforms run jobs and report results.