Merging Schedules
It is possible to merge two existing schedules together. This process will combine the jobs of both schedules into the one schedule.
To merge schedules:
- Double-click on Schedule Master under the Administration topic. The Schedule Master screen displays.
- Select a schedule in the Schedule drop-down list. Alternatively, click on the Find button to locate the schedule.
- Click the Merge Schedule button on the Schedule Master toolbar. The Merge Schedules dialog displays.
- Select in the drop-down list the schedule to be merged to the current schedule.
- Click OK to save the changes or click Cancel to discard the changes.
- Click Close ☒ (to the right of the Schedule Master tab) to close the Schedule Master screen. :::