Viewing and Updating Resource Updates
The Resource Update panel in Daily Job Definition displays defined resource updates for the selected job. A resource update instructs OpCon to change the maximum number of resources for a named resource when a job enters a specific status, such as Finished OK or Failed.
For conceptual background, refer to Threshold/Resource Updates.
Only users with the appropriate permissions can access the Lock button and update job properties. Refer to Required Privileges for details.
Changes made in Daily Job Definition take effect immediately. If the job has already run, changes apply the next time the job runs.
Panel indicators
- Select the Full Screen button (
) at the far right of the panel bar to enter or exit Full Screen mode.
- When the panel contains defined properties, a blue circular indicator (
) appears to the right of the panel name showing the property count.
Add or update a resource update
To add or update a resource update for a daily job, complete the following steps:
-
Select the Processes button at the top-right of the Operations Summary page.
-
Confirm that both the Date and Schedule toggle switches are enabled (green).

-
Select the desired date(s) to display associated schedules.
-
Select one or more schedule(s) in the list.
-
Select one job in the list. Your selection appears in the status bar as a breadcrumb trail.

-
Select the job record (e.g., 1 job(s)) in the status bar to open the Selection panel.
noteAlternatively, right-click the job in the list to open the Selection panel.
-f5a1a0f534189eaf4359e46f29dacb2e.png)
-
Select the Daily Job Definition button
at the top-left of the panel. The page opens in Read-only mode by default.
-
Select the Lock button
at the top-right to enter Admin mode. The button switches to a white unlocked lock on a green background
.
noteThe Lock button is not visible to users without the appropriate permissions.
-
Expand the Resource Update panel.
-
Make any of the following changes:
-
To edit an existing resource update, select it and modify the fields as needed.
-
To delete an existing resource update, select the delete control next to the entry.
-
To add a new resource update, select the green Add button (+). In the Resource Update dialog, complete the following fields:
Field Description Job Status The job status that triggers the update (for example, Finished OK or Failed). Resource The resource name to update. Value The maximum number of resources to set for the resource when the update triggers. Select Save to save and close the dialog.
noteSelect the Undo button to discard unsaved changes.
-
-
Select the Save button.
Result: The resource update is saved to the daily job definition and takes effect the next time the job runs.